1. Commercial / plant assumptions
The electricity rate is fully editable.
Replace the CO₂ factor with the factor used by
the client's ESG/carbon-accounting methodology
when available.
2. Compressor data
| Compressor | kW | FAD | Run h/day | On-load | Off-load | Pressure | Control | Action |
|---|
3. Demand-side / system information
These are opportunity assumptions, not guaranteed
savings. For a formal Air Energy Audit proposal, replace
them with measured audit results such as kW, flow,
pressure profile, leakage test, compressor-control
response and production demand.
4. Results
Estimated baseline electricity
0
kWh/year
Baseline electricity cost
PKR 0
/year
Estimated annual energy saving
0
kWh/year
Estimated annual cost saving
PKR 0
/year
Saving potential
0%
of baseline electricity
CO₂ reduction
0
kg CO₂/year
CO₂ reduction
0
tonnes/year
Current pressure band
0
bar
Calculation rules & methodology
| Calculation | Formula / rule | Purpose |
|---|---|---|
| Baseline loaded energy | Motor kW × on-load hours/day × operating days/year | Estimated compressor energy while loaded. |
| Baseline unloaded energy | Motor kW × off-load hours/day × unloaded-power factor × operating days/year | Fixed-speed unloaded energy penalty. Default unloaded factor = 25%. |
| Baseline total | Loaded + unloaded energy | Estimated annual compressor electricity. |
| Leakage opportunity | Baseline × leakage % × 0.70 | Conservative energy-saving conversion; not all leakage can necessarily be eliminated. |
| Pressure reduction | Baseline × pressure-saving factor | Approx. 7% energy reduction per 1 bar reduction as a screening rule. |
| Sequencing/control | Baseline × control improvement % | Reduction from better compressor sequencing and less unnecessary unloading. |
| System efficiency | Baseline × efficiency improvement % | Efficiency measures such as optimization, maintenance and operating-point improvements. |
| Air-use/process | Baseline × process optimization % | Reduction in unnecessary air demand. |
| Total saving | Sum of opportunity savings, capped at 35% of baseline | Prevents the screening calculator from producing an unrealistic aggregate saving. |
| Cost saving | kWh saved × electricity tariff | Annual PKR saving. |
| CO₂ saving | kWh saved × CO₂ factor | Annual avoided Scope 2 emissions using the selected factor. |
This is a screening model, not a replacement for
a calibrated power/flow audit. Final savings should
use measured electrical power, FAD/flow, pressure,
operating profile and production data.
Recommended Air Energy Audit inputs
Electrical
True kW, kWh, current, voltage, PF, load/unload profile.
True kW, kWh, current, voltage, PF, load/unload profile.
Air
FAD/flow, pressure, dew point and demand profile.
FAD/flow, pressure, dew point and demand profile.
Control
Cut-in/cut-out, VFD/FSD, sequencing and standby logic.
Cut-in/cut-out, VFD/FSD, sequencing and standby logic.
Leakage
Leakage survey or off-shift demand test.
Leakage survey or off-shift demand test.
Network
Piping size/layout, pressure drops, storage and dryers.
Piping size/layout, pressure drops, storage and dryers.
Production
Operating hours, production rate and process air requirements.
Operating hours, production rate and process air requirements.